Trade & architects
uPVC windows and doors for builders and architects
We make and install uPVC windows and doors for builders, developers, architects and building designers across Melbourne and regional Victoria. Belgian Deceuninck profiles and Australian double glazing, manufactured and installed by our own team in Campbellfield.
Trade partners
Who we work with
-
Builders
New builds and renovations, made and installed by our own team. Installation dates are agreed before manufacturing starts.
-
Developers
Apartment and commercial projects, with an itemised quote you can check line by line.
-
Architects
Product specifications and the documentation your certifier or consultant needs, confirmed before you specify.
-
Building designers
Opening styles, sizes and glazing options for each product, so your drawings match what we make.
On every project
What we provide
-
Specifications
Profile, glazing, hardware and size details for every product in our range of uPVC windows and uPVC doors.
-
Compliance documents on request
Tell us what your certifier or consultant needs. We confirm what we can supply for the products you specify before you commit.
-
Clear lead times
Windows take about 2–4 weeks to manufacture and doors 2–5 weeks once the quote is approved. Installation dates are agreed before manufacturing starts.
-
One point of contact
One person from our Campbellfield team, from enquiry to handover. We make and install the frames ourselves, with no subcontractors.
Passive House projects
Legendary 80 mm Series
For Passive House and other low-energy projects we offer our 80 mm series. Below are its Passive House certificates and test reports, plus two sliding door reports for the 92 mm Fix Slide Series, so your designer or energy consultant can check the figures before you specify.
The certificates and the window and entry door reports were issued for the Finesse Passive 80 system, the sliding door reports for the Finesse Passive 92 mm Fix Slide Series, all in the name of Finesse Window Systems Australia Pty Ltd, Campbellfield. Ask us which openings, sizes and glazing suit your project.
| Value | Passive 80 Tilt and Turn | Passive 80 Fix |
|---|---|---|
| Component ID | 1871wi04 | 1872wi04 |
| Efficiency class (scale phE to phA) | phC | phA |
| Window Uw with Ug 0.90 | 0.99 | 0.96 |
| Window Uw with the best glazing listed | 0.81 (Ug 0.64) | 0.70 (Ug 0.58) |
| Frame Uf | 0.92–0.99 | 0.80–0.88 |
| Uw installed (validated installations) | 1.01 | 0.97 |
| Valid until (as printed) | 31 Dec 2022 | 31 Dec 2022 |
Common to both certificates
- Issued by
- Passive House Institute, Darmstadt, Germany
- Climate zone
- Warm, temperate
- Frame
- Timber-PVC composite and PVC
- Glazing
- 50 mm triple glazing (6/16/6/16/6), Super Spacer Premium spacer, butyl secondary seal
- Test window
- 1.23 × 1.48 m
- Maximum size
- 1.2 × 2.3 m or 0.8 × 2.4 m
Passive House certificates
Both certificates are printed as valid until 31 December 2022. Ask us for the current certification before you specify.
Test reports
By Ian Bennie & Associates, Dandenong South: specimen tests by the methods of AS 4420.1-2016 to the requirements of AS 2047-2014. Each report applies to the sample tested. The two sliding door reports cover the 92 mm Fix Slide Series.
- Finesse Passive 80 mm tilt and turn window with fixed low lite Test report 2022-009-S2, April 2022 · PDF, 1.4 MB
- Finesse Passive 80 mm entry door Test report 2022-009-S3, March 2022 · PDF, 1.2 MB
- Finesse Passive 92 mm Fix Slide Series sliding door with interlock stiffener Test report 2022-009-S4, May 2022 · PDF, 1.1 MB
- Finesse Passive 92 mm Fix Slide Series sliding door Test report 2022-009-S1, April 2022 · PDF, 1.2 MB
Your project
Send a trade enquiry
Tell us about the project and the products you have in mind. We reply within one business day.
- Call 0404 635 555, Mon–Fri 9–5 · Sat 10–2
- Plans by email to info@legendarywindows.com.au
Thanks — we've got it.
We reply within one business day.
Want to add photos or anything else? Send it to us on WhatsApp.
Message us on WhatsAppQuestions
Trade and architects: common questions
Can't find your question? Call 0404 635 555 or message us on WhatsApp.
What documentation do you provide?
For our 80 mm series, the Passive House certificates and test reports are on this page to download, along with two sliding door reports for the 92 mm Fix Slide Series. For other products we supply specifications and compliance documentation on request. Tell us what your certifier or consultant needs when you enquire, and we will confirm what we can provide for the products you are specifying before you commit, so nothing is assumed.
What lead times should I plan for?
Windows are manufactured in about 2–4 weeks and doors in 2–5 weeks after the quote is approved. For larger or multi-opening projects, we agree the installation dates with you at that point, so the programme is set before manufacturing starts.
Who is my point of contact?
One contact from our Campbellfield team, from enquiry to handover. You are not passed between a salesperson, a factory and an installer, because we manufacture and install ourselves. That single line of responsibility keeps a job moving and makes it clear who answers for the result.
Do you work with builders and developers?
Yes. We manufacture and install for builders, developers and architects, using our own installers with no subcontractors. We work on new builds, renovations, apartments and commercial projects across Melbourne and regional Victoria. Send the project details through the trade form and email the plans to us, and we reply within one business day.
Can you supply without installing?
Yes. We have two contracts: supply and deliver, or supply, deliver and install. Tell us which suits your project when you send the details.